Hours

Open 24 hours

20 East 10th St.

Roanoke Rapids, NC 27870

John 15:5

Veteran Owned

Call Us

252-673-8960

Why LOTO Evaluations Matter

LOTO is the backbone of every safe confined space entry, maintenance task, and rescue response. When LOTO drifts, everything downstream becomes unsafe — even if the written program looks perfect on paper.

A LOTO evaluation gives you clarity, accuracy, and confidence.

What Causes LOTO Drift

System Modifications

  • Equipment upgrades
  • Control panel changes
  • Valve replacements
  • Added or removed isolation points

Generational Knowledge Loss

When experienced operators retire, undocumented knowledge disappears.

Contractor Influence

Temporary isolation workarounds often become permanent.

Inconsistent Try Start Practices

Try start is the ultimate truth test — and the most inconsistently performed step in industry.

What Our Evaluation Includes

1. Written Program Review

We evaluate:

  • Policy structure
  • Procedure clarity
  • Isolation point accuracy
  • Update frequency
  • Alignment with OSHA 1910.147

2. Field Walkdowns

We verify:

  • Every isolation point
  • Valve and breaker labeling
  • Control panel logic
  • Stored energy sources
  • Hidden or undocumented hazards

3. Try Start Verification

We test:

  • Whether equipment truly cannot start
  • Whether isolation points are correct
  • Whether drift has occurred
  • Whether the written procedure matches reality

4. System Change Mapping

We identify:

  • What changed
  • When it changed
  • Why it changed
  • How it impacted the LOTO procedure

5. Corrective Action Plan

You receive:

  • Required updates
  • Recommended improvements
  • High risk gaps
  • Quick wins
  • Long term fixes

Why Hux You bring a rescue team perspective that most consultants don’t.

You understand:

  • What happens when LOTO is wrong
  • How drift impacts rescue readiness
  • How try start reveals the truth
  • How Entry Supervisors rely on accurate isolation

This is the credibility clients trust.

Deliverables

  • Full written evaluation report
  • Updated or corrected LOTO procedures (if requested)
  • Drift analysis summary
  • Try start verification log
  • Corrective action roadmap

Schedule Your LOTO Program Evaluation

Request Evaluation